Tweet/Garot has been a family-owned mechanical contracting business for over 120 years. Beyond simply designing and building high-quality mechanical solutions, our industry-best workforce provides a complete commitment to each project and extraordinary customer service.
Tweet/Garot design teams continue to push limits of technology within the construction industry. We have created the ability to provide a more detailed mechanical concept model to our construction partners with less information, and in record times.
With nearly 155,000 square feet of prefabrication space, our customers are confident in our ability to not only reduce our man-hours on site and reduce transportation costs, but also help shorten the time required to complete our critical, preliminary work.
Tweet/Garot is dedicated to providing our clients with a smarter, energy-efficient, and more comfortable facility, always functioning at peak performance.
Tweet/Garot specializes in—and is recognized for—our ability to work around our customers’ demanding schedules, no matter what market. We utilize fast-track construction methodology, virtual design technology, and continuous improvement in all that we do. Our clients know that Tweet/Garot thrives on solving challenges.
Tweet/Garot was chosen as the mechanical contractor to remodel 592 jail cells in the Green Bay Correctional Institution as we had the resources to cover the scope of project specifications. Our work included mechanical and plumbing upgrades to the facility.
GBCI was first opened in 1898 and most of the buildings were built by prisoners. 16” walls were constructed on each side of the mechanical chase. We cored approximately 5,300 holes throughout these larger thick walls to provide all new waste and water piping to the new combination units. Accurate measurements and layout where crucial for laying holes for coring.
592 cells were remodeled with new stainless steel combination units which included both a combined toilet and sink. The new units are equipped with wireless communications and water control devices. Each unit can be remotely monitored, and have its water shut down from the main computer in the security room. All new riser piping was prefabbed and installed onsite to meet the 16-cell turnover every three weeks.
Some challenges of this project came with the prisoners in close proximity to the work sites. All workers on site always needed an escort and tools had to be kept far away from the work area to guarantee prisoners couldn’t get their hands on them. Regular material checks were required to keep track of all materials. Nevertheless, some of our biggest challenges that Tweet/Garot has experienced during a job to date didn’t stop this project from being completed on time.