Our customer had expanded their existing facility by more than 150,000 square feet to install a new machine to manufacture nonwoven components for various diaper and Depends products. Tweet/Garot was selected to be the installation contractor for the building ventilation led by field leadership from Green Bay with the support from local craft labor.

The overall project had challenges specifically with material and equipment lead times, however the team was able to plan and strategize to successfully complete the project with a satisfied customer. Poor weather conditions also posed an obstacle for the field crew.

Installation of the large ductwork above the machine required tradespeople to be highly trained in rigging for a flawless install and an on time project completion.