Project Information

Chiller being carried by a Crane at Kewadin Casinos

Kewadin Casinos

Sheet metal, Pipefitting and Service Technicians were involved on this project.  This project included the replacement of major HVAC Equipment including RTU’s, Boilers, and Chillers. Modification of existing HVAC systems, equipment stands and openings were modified to accommodate new equipment.  This required special craftsmanship.  Duct cleaning of the existing systems was also part of this project in an effort to provide clean air to the casino patrons.  Tweet/Garot installed Bipolar Ionization on new and existing equipment and added additional filtration for cigarette smoke.

Utilization of newly developed technology such as Bipolar Ionization added filtration to eliminate pathogens and bacteria. Tweet/Garot also replaced existing boilers with high energy efficient boilers for overall energy savings.

Challenges faced during this project included a short completion schedule. The funding for this project came with a firm deadline for work to be completed, basically use it or loss it.  Due to past experiences, the customer knew that Tweet/Garot could complete this project on time.

Delayed project deliveries shortened the allotted installation time. In addition, boilers needed to be installed before cooler months which further tightened our project schedule.

Despite COVID-19 challenges on the jobsite, the field crew had zero reported injuries.

Gundlach Champion, Clean Air Services, S & T Electric, Automated Logic Controls and complete Cover for insulation were all on the project team.  COVID-19 relief funds were used to finance this renovation.