Process Piping System at Pagel's Ponderosa

Pagel’s Ponderosa

Tweet/Garot was selected as the mechanical contractor to perform all of the piping for manure, biogas, RNG and heating for up to 2M gallon anaerobic digesters and related RNG facilities to capture methane produced by cow manure at the farm.

In addition, Tweet/Garot was responsible to receive, unload, set and pipe all of the associated equipment that cleans the digester-produced biogas, transforming it into commercial-grade pipeline-quality renewable natural gas. Tweet/Garot was also responsible for the HVAC scope of work for all the sites and performed all of the underground gas piping to transfer the natural gas to loading stations.

Piping systems ranged from low pressure to 4,300 psi.